1 | South Pars Field Oil Layers Development Project (Phase1 - Step II) | MDP ,Drilling Study and Engineering | IOID/POGC | Drilling Section of Consultancy | South Pars | 2019 |
2 | NISOC 27 Fields EPD Tender Documents Preparation | tender Ducs ,Consultancy and Engineering | NISOC | Drilling Section of Consultancy | Ahwaz | 2018-2022 |
3 | Parsi, Rag-e Sefid Oil Fields | Consultancy and Principals MDP & Engineering | OGDC | Drilling Section of Engineering | Karanj Parsi Rag-e Sefid | 2017 |
4 | Darquain Phase 3, Kish | MDP, Engineering Consultancy and Engineering | ICOFC | Drilling Section of Engineering | Darquain | 2017 |
5 | Phases 2&3, Sepehr and Jufeyr (Ghadir) | MDP, Engineering Consultancy and Engineering | ICOFC | Drilling Section of Engineering | Darquain | 2017 |
6 | Pakistan Ghauri Block | Drilling Optimization Study in Pakistan | EDS Co. | Preparation of MDP for Drilling Section | Pakistan | 2013 |
7 | South Yaran Oilfield | Consultancy and Supervision | PEDEC | MDP & Engineering for Drilling and Supervisionr | Ahwaz | 2013 |
8 | Sepehr Oilfield Development | Consultancy | Arvandan Oil and Gas Co. | Preparation of MDP for Drilling Section | Abadan | 2012 |
9 | South Yaran Oilfields Development | Elementary and Comprehensive Plan Studies | PEDEC | Preparation of MDP for Drilling Section | Abadan | 2011 |
10 | Danan Oilfield | Full Field Study and Main Development Plan | PEDEC | Preparation of MDP for Drilling Section | Danan Oilfield | 2011 |
11 | Jofeir Oilfield | MDP , ConsultancY and Supervision | PEDEC | Preparation of MDP for Drilling Section | Jofeir | 2009 |
12 | Tosan and Balal Oilfields | Consultancy, Management and Technical Services for | IOOC | Preparation of MDP for Drilling Section | IOOC | 2011 |